LiDAR point cloud straight into the structural model
A capability that is still rare worldwide: the standing, deformed tower is captured by terrestrial and drone LiDAR, and that as-found geometry — bowed members, out-of-plumb legs, moved joints — is rebuilt as a Consteel / FE digital twin. Capacity and stability are verified on the real shape, with imperfections measured instead of assumed.
A tower is a tower anywhere in the world
Lattice steel and structural mechanics do not change with the country. Wind, ice, geometry and joint behaviour follow the same physics on any continent — so the experience and judgment built on European corridors holds up wherever the line stands. Only the code annexes and client specifications change, and those are part of the scope.
You talk to the engineer, not a layer
Every model, report and site visit is handled by the engineer who signs it. No account manager translating your problem, no junior redoing it after handover. Questions get technical answers the same day.
Research-grade analysis, not template checks
Non-linear stability, second-order effects, joint behaviour and fatigue are modelled — not assumed away with conservative shortcuts. Consteel and PLS-Tower workflows backed by PhD-level structural theory.
Field-verified, not desk-only
Assessment is grounded in what the structure actually looks like: corrosion, deformation, bolt condition, foundation interface. Off-road and drone-supported access from sea level to mountain corridors.
Documentation that survives scrutiny
Reports written to be defended — in front of a TSO's technical committee, an insurer, or a court. Traceable assumptions, referenced standards (EN 1993, EN 50341), reproducible models. ISO 9001:2015 certified.
Built for cross-border work
Eurocode-native engineering with EU-wide applicability, working in English, Romanian and Hungarian. National annexes and client-specific technical specifications handled as part of the scope.
Small enough to move fast
A focused practice with no internal queue. Urgent damage assessments, second opinions and pre-tender feasibility checks can start within days, not after a procurement cycle.